6 Hours Turnaround
As-Built Drawings
Accurate as-built drawings showing field changes, final equipment locations, and the installed system.
- Field modification documentation
- Final equipment locations
- Installed system configuration
- Construction change records
- Updated site plan with final panel layout
- Revised single-line diagram (as-installed)
About This Service
We update your original permit set from site photos and field markups — delivered within 6 hours, ready for inspection and closeout.

Everything Included
Field modification documentation
Final equipment locations
Installed system configuration
Construction change records
Updated site plan with final panel layout
Revised single-line diagram (as-installed)
Inspection-ready closeout package
Records for future maintenance
Revision tracking vs. original permit
Digital & print-ready formats
As-Built Solar Projects — Residential
Completed rooftop installs — the field conditions our as-builts capture.




Other Services You May Need
2 Hours TAT
Solar Sales Proposals
Data-driven proposals built on LiDAR, production modeling, and savings analysis — made to close deals.
Site Surveys & Assessments
Roof measurements, shading, and structural review — the base for accurate system design.
6 Hours TAT
Solar Permit Design
AHJ-ready permit plan sets and full permitting — SLDs, structural details, SolarAPP+, and AHJ coordination.
Start Today
Your Trusted Solar Engineering Partner
One project or your full design team — we work as an extension of your business.
No contract required — pay per project
First project delivered with a 100% satisfaction guarantee
Dedicated account manager from day one