Which NEC edition do your designs comply with?
The edition your jurisdiction has adopted — usually NEC 2020 or 2023. The code cycle is noted on every drawing set.

AHJ-ready plan sets, PE stamps, and interconnection — proposal to PTO with fewer delays.
Every AHJ and utility has its own rules. We build to them.
Local building and fire codes, including fire-pathway setbacks.
Your adopted NEC edition, noted on every set.
Prepared and managed where your AHJ supports it.
Licensed structural and electrical PEs, stamped where required.
Applications and utility documents, through to PTO.
Monday - Friday, 8am - 10pm CT. Saturday, 9am - 5pm CT.
One service or the full project — proposal to PTO.
Sample proposals and permit drawings. Project details removed.
Simple. Transparent. On time.
Send site, equipment, and utility details.
InstantWe confirm details and assign an engineer.
< 30 minDrawings built to your AHJ and NEC.
Core TATSenior engineer checks every sheet.
IncludedPermit-ready set delivered. Free AHJ revisions until approval. Revision policy
On TimeThe edition your jurisdiction has adopted — usually NEC 2020 or 2023. The code cycle is noted on every drawing set.
Yes. Licensed electrical and structural PEs in every state, all with current E&O insurance. Proof of licensure on request.
Yes — utility applications, technical documents, and coordination through approval, plus PTO submissions and closeout.
Permit designs: 6 hours. Rush: 3 hours. Sales proposals: 2 hours. PE review: 6 hours. The clock starts once we have all project details.
Unlimited AHJ and utility revisions, free, until the permit is approved — including our errors, like-for-like equipment swaps, and minor layout changes. Redesigns, such as adding batteries, are quoted separately.
Read the full revision policyWithin 30 minutes during business hours, or the next business morning after hours. Your first reply includes a quote and delivery date.
One project or your full design team — we work as an extension of your business.