7 Common Reasons Solar Permits Get Rejected
The plan-check comments we see most often — and how to avoid them before you submit.
TriventX Engineering Team ·

1. Wrong code edition
- Designing to an NEC or fire code edition the AHJ hasn’t adopted.
- Missing the local amendments that sit on top of the model codes.
- Fix: confirm the adopted editions and note them on the cover sheet.
2. Fire pathways and setbacks
- Roof access pathways and ridge setbacks missing or not dimensioned.
- Array placed where the local fire code doesn’t allow it.
- Fix: dimension every pathway on the roof plan.
3. Incomplete structural information
- No rafter size, spacing, or span shown.
- Attachment spacing missing, or load calculations left out where the AHJ requires them.
- Fix: include attachment details and the roof framing on the plans.
4. Equipment that doesn’t match
- Model numbers on the plans differ from the datasheets attached.
- Datasheets that don’t show the required listings.
- Fix: cross-check every model number before you submit.
5. Electrical errors
- Undersized conductors or incorrect overcurrent protection.
- Busbar loading (the 120% rule, NEC 705.12) not addressed.
- Grounding, bonding, or rapid shutdown method not shown.
6. Missing labels and placards
- Required NEC warning labels not listed or not located.
- No placard showing the location of disconnects and rapid shutdown.
7. Hard-to-read drawings
- Missing scale, north arrow, dimensions, or sheet numbers.
- Sheets that don’t meet the AHJ’s size or format rules.
Before you submit
- Download the AHJ’s current submittal checklist.
- Check code editions, setbacks, and structural details.
- Match every model number to its datasheet.
- Have a second engineer QA the full set.